Solar Energy Generation
1000-1200+ average units generated per day by solar plant and excess energy is fed back to the GRID
GEV is committed to SDG 7: “Ensuring access to affordable, reliable, sustainable, and modern energy for all.” Achievements by 2023 include a 300 KW Solar Power Plant, Solar Irrigation Pump, Biogas Plant, Electric Vehicles, and energy-efficient appliances
covers 55% of GEV’s energy needs and reduce Carbon footprint by 53% (268 tonnes of CO2)
1000-1200+ average units generated per day by solar plant and excess energy is fed back to the GRID
GEV has three biogas plants with a capacity of 22 cubic meters, converting organic waste into clean energy. Two biogas plant runs on cow dung, while the third biogas (with a 2kg input capacity) is on organic matter
Floating Drum Biogas (10 m3)
Modular/ Balloon Biogas (12 m3)
Household Vaayu Biogas (200 Litres)
GEV has 5 open wells, with 2 open wells- water extraction is by using Solar Irrigation Pump for water extraction
Only Electric Vehicles inside the Campus
Heat Pump
Brushless DC Fans
Note: All lights used inside campus for daily activities are LED.